BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20200214T013000Z
DTEND:20200214T030000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Cody's Sheridan Avenue project meeting
DESCRIPTION:Prime contractor S&S Builders\, LLC\, of Gillette and Wyoming Department of Transportation will host the Feb. 13 public meeting\, being held prior to the start of construction activities on March 2 in the Sheridan Avenue/10th Street intersection\, weather permitting.\n\n\n\nThe Sheridan Avenue project includes removing and replacing existing damaged concrete slabs\, resealing existing concrete joints\, grinding and texturing existing roadway\, upgrading ADA at every corner between 10th Street and Stampede Avenue\, and replacing broken curb and gutter and sidewalk.\n\n\n\nRead the full press release.
X-ALT-DESC;FMTTYPE=text/html:Prime contractor S&amp\;S Builders\, LLC\, of Gillette and Wyoming Department of Transportation will host the Feb. 13 public meeting\, being held prior to the start of construction activities on March 2 in the Sheridan Avenue/10th Street intersection\, weather permitting.<br />\n<br />\nThe Sheridan Avenue project includes removing and replacing existing damaged concrete slabs\, resealing existing concrete joints\, grinding and texturing existing roadway\, upgrading ADA at every corner between 10th Street and Stampede Avenue\, and replacing broken curb and gutter and sidewalk.<br />\n<br />\n<a href="https://files.constantcontact.com/5a76ed6c001/1cc7a3db-eb61-40bd-8c1d-2e75acf2b36a.pdf" target="_blank">Read the full press release.</a>
LOCATION:Cody Auditorium 1240 Beck Avenue
UID:e.370.6662
SEQUENCE:3
DTSTAMP:20260404T170001Z
URL:https://business.codychamber.org/events/details/cody-s-sheridan-avenue-project-meeting-6662
END:VEVENT

END:VCALENDAR
